Hall Gate Farm, Pilsley
LTP provided transport planning support and highway design for this renewable energy development in Derbyshire.
Ā
The Project
Development of aĀ Battery Energy Storage System (BESS)Ā at Hall Gate Farm near Pilsley, Derbyshire.
Ā
Our Role
LTP prepared a Transport Statement (TS) to support the planning application, including swept path analysis for HGVs and an abnormal load low-loader vehicle accessing the site via the local rural road network.
LTP also developed a preliminary design for the proposed site access onto Hallgate Lane, helping to address constraints and demonstrate that a suitable and deliverable access could be achieved.
Ā
The Outcome
There was no objection from Derbyshire County Council Highways, helping to ensure that planning consent was secured.